|
ENGINEERING (P WAY) - STUDY MATERIAL (Civil Engineering Department Railway) (Hindi & English) |
|
SYLLABUS - LDCE Group 'B' of ADEN/AEN Engineering (P Way / Works) Department Study Material & Question Bank |
|---|
|
SPECIAL |
|
Type & category of encroachments in Railway & division fixation of responsibility for encroachments |
| Action plan for prevention and removal of encroachments from Railway land |
INDEX - ENGINEERING(P WAY) INDIAN RAILWAY (HINDI) |
|
| Railway Organisation & Civil Engineering | |
| P Way - Welded Rail Related Definitions | |
| Duties (कर्तव्य) | |
|
Duties of JE /SSE / P Way (Other Than Sectional Or In-Charge) |
|
| E01.02 Duties of Keyman | |
| E04.01 Ballast |
|
| E04.02 Ballast Profile for L.W.R. track | |
| E04.03 Formation | |
| E04.04 Bridges | |
| E06.01 Basics of Curves | |
E06.02 Realignment of Curve |
| Points and Crossing (पाइंट्स तथा क्रासिंग) | |
|---|---|
| E05.01 Points & Crossings: Introduction & Definitions | |
| E05.02 Special Layouts | |
| E05.04 Maintenance and Inspection of Points and Crossing | |
| E05.05 Reconditioning of Points and Crossing | |
| Patrolling & Its Type | |
| LWR/CWR (एलडब्लूआर / सीडब्लूआर) | |
|---|---|
| E14.02 Permitted locations for LWR/CWR | |
| E14.03 Destressing of LWR | |
E14.04 Maintenance of LWR / CWR |
|
| E14.05 DOs and Don’ts OF LWR For PWM | |
| कांक्रिट स्लीपर के फायदे और कांक्रिट स्लीपर मेँ कमियाँ | |
| Safe Working of Contractors (As per Cs.No 95) |